Design a POC on one page
What you will learn Not a chapter to read but one to do. You will design one POC on a single page. The most important box is not the success criteria — it is the stop conditions.
What you need
If you have not picked a task yet, do scoring your candidates for real first.
That third line is a condition, not a suggestion. A POC designed without the people who do the work stalls three weeks in, at "that is not how we actually do it."
Step 1 — Narrow it to one sentence (5 min)
What to look for
If any answer is no, it is still too wide. The purpose of a POC is not results but a decision — the narrower it is, the sooner you decide.
Step 2 — Write today's numbers (10 min)
If you already have a baseline, copy it across. Otherwise write only what you can answer right now.
| Item | Today's value | Where you checked |
|---|---|---|
| Volume (week/month) | ||
| Time per case | ||
| What quality is measured by today |
Write "unknown" rather than leaving it empty. An empty box looks like something you forgot; "unknown" is a decision.
Step 3 — Success criteria (10 min)
It is only a success criterion if it contains both a number and a date.
| Our criteria | When | What | How much |
|---|---|---|---|
| 1 | |||
| 2 |
Two at most. Write more than three and you will hit one of them and call it a "partial success."
Step 4 — Stop conditions (10 min)
This is the point of the exercise. Most POC documents have no such box, which is why POCs that are not working run for six months.
Why this matters more than the success criteria
Success criteria are used when it works. Stop conditions are used when it does not — and most POCs land on the second side. With no basis for that judgement written down, "let's give it a bit longer" repeats, because nobody finds it easy to propose killing the thing they started.
Stop conditions can only be written honestly before you start. Afterwards, the money already spent bends the judgement.
Step 5 — Collect it onto one page (5 min)
Fill in that last line. Without "out of scope" written down, the scope grows mid-flight, the growth breaks the deadline, and the broken deadline postpones the decision itself.
Self-check
If the fourth is unchecked, go back to step 4. A POC without stop conditions is not a design — it is a request for approval to begin.
Check yourself
1. Why do stop conditions matter more than success criteria?
Answer
Because most POCs end up on the "did not work" side. Success criteria are only used when it works; without a written basis for the other case, "a bit longer" repeats. And after starting, sunk cost makes honest writing much harder.
2. Why write "unknown" instead of leaving the box empty?
Answer
"Unknown" is a decision; an empty box looks like an oversight. Two or more of them immediately yields the judgement that you should be measuring, not running a POC.
3. Why write down what is out of scope?
Answer
Because scope grows during the run. The growth pushes the deadline, and a pushed deadline removes the moment of decision entirely. Nailing the boundary before you start is cheaper.
The final stage → Phase 4 — production rollout